ARTICLE
10 August 2018
Analysis of Winter Concrete Construction in Water Conservation Project
Wenzhong Sun
Show Less
1 Puyang Yellow River Diversion Project Management Department Puyang,
© 2018 by the Authors. Licensee Whioce Publishing, Singapore. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution 4.0 International License ( https://creativecommons.org/licenses/by/4.0/ )
Abstract

The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer. In most areas of Northern China, the temperature during winter remain at lower level, in which environmental factors play the most important role in the construction of water conservancy projects. In particular, low temperature directly affects the strength of concrete and delays its solidification, this highly affects the quality and progress of concrete construction. In order to overcome this barrier, better planning, for reasonable and effective construction techniques and targeted control measures should be adopted to reduce the adverse effects of low temperature to assure a strong and safe architecture.

Share
Back to top