Volume 10,Issue 4
This research focuses on using BIM modeling optimization to control construction - period risks in the pre-construction stage of industrial factory buildings. It analyzes common risk factors and limitations of traditional approaches. BIM-based methods like collision detection, 4D simulation, multi-dimensional data integration, etc., can effectively mitigate risks. Stakeholder collaboration, digital twin testing, and lean BIM integration is also crucial. Case studies show BIM can reduce risks by 32–41%, with a three phase roadmap provided.