Volume 10,Issue 7
This research focuses on office building electrical engineering facilities. It elaborates on evaluating their operation status using key performance indicators, real-time monitoring, and analyzing baseline energy usage. Energy inefficiency hotspots are identified. The hybrid fuzzy-AHP and dynamic weighting are used in assessment. Prototype validation, comparative analysis are carried out. Energy-saving measures like VFDs and predictive lighting are proposed, along with economic and carbon-emission-related evaluations.