ARTICLE
11 March 2026
Research on Collaborative Avoidance Design Technology for Road Horizontal Alignment and Underground Pipelines Based on BIM
Xiang Zhang
Show Less
1 China Merchants Chongqing Communications Technology Research & Design Institute Co., LTD., Chongqing 400067, China,
JWA 2026 , 10(1), 20–27; https://doi.org/10.26689/jwa.v10i1.14157
© 2026 by the Authors. Licensee Whioce Publishing, Singapore. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution 4.0 International License ( https://creativecommons.org/licenses/by/4.0/ )
Abstract

Traditional road horizontal alignment design faces bottlenecks such as limited terrain representation, inefficient information updates, and inadequate multi-factor collaboration. Underground pipeline design also encounters issues of professional fragmentation and frequent conflicts. The lack of coordination between the two leads to construction rework and increased costs. Based on this, this paper first constructs a BIM-based technical system for road horizontal alignment and then explores collaborative avoidance techniques for underground pipelines. Using engineering examples, it investigates the BIM-integrated application of collaborative avoidance between road horizontal alignment and underground pipelines. Through analysis, the paper aims to address the challenges of coordination in road and underground pipeline design, break down professional information barriers, proactively avoid conflicts, and provide technical support and practical references for enhancing the quality and efficiency of municipal engineering design.

References
Yan S, Lin Y, Sun M, 2025, Optimization Analysis of Comprehensive Pipeline Layout in Underground Garages Based on BIM Technology. Electrical Technology in Intelligent Buildings, 19(3): 124–127.
Ou K, 2022, Analysis of Road Route Selection for the Southern Extension Section of Huangge Road in Longgang District, Shenzhen. Engineering and Technological Research, 7(17): 9–11.
Zhang X, 2021, Research on the Design and Application of a Road Route Selection System Based on BIM+GIS Technology. Communications Science and Technology Heilongjiang, 44(9): 67–68.
Liao C, 2024, Collision Analysis and Technical Treatment of Water Supply and Drainage Pipelines in Urban Underground Spaces. China Construction, 2024(11): 169–171.
Wu B, Wang W, 2020, Research on the Application of BIM Technology in the Comprehensive Pipeline Layout of Municipal Road Reconstruction Projects. Urban Roads & Bridges and Flood Control, 2020(10): 191–193.
Share
Back to top