Analysis of Key Points in Engineering Project Management under the EPC Model
Yu Zhang Zhenhua Li
Show Less
1 China Merchants Chongqing Testing Center for Highway Engineering Co., Ltd., Chongqing 400067, China,
JWA 2026 , 10(2), 79–86; https://doi.org/10.26689/jwa.v10i2.14699
© 2026 by the Authors. Licensee Whioce Publishing, Singapore. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution 4.0 International License ( https://creativecommons.org/licenses/by/4.0/ )
Abstract

The construction process of engineering projects is complex, encompassing multiple critical stages such as engineering design, raw material procurement, and construction. Although the nature of work varies across these stages, they are highly interconnected. Any issues arising in one stage can impact the effectiveness of work in other stages. Under the EPC model, engineering project management can integrate the processes and resources of project construction, thereby enabling full-process control and thereby enhancing management efficiency while reducing risks. This article primarily analyzes the concept and characteristics of the EPC model and summarizes the key points of engineering project management under the EPC model at different stages, including decision-making, design, procurement, construction, and completion acceptance. Finally, it proposes optimization suggestions for engineering project management under the EPC model, providing a reference for the high-quality implementation of the EPC model in engineering management.

References
Wang Q, Li Q, 2024, Research on EPC Project Management Strategies under the Consortium Model. Brick-Tile World, 2024(14): 160–162.
Chen H, 2024, Analysis of Problems in EPC Project Management and Countermeasures. Sichuan Water Power, 43(4): 54–57.
Gong G, 2025, Practice and Discussion on EPC Project Management in Chemical Engineering under the New Situation. China Petroleum and Chemical Standard and Quality, 45(3): 67–70.
Liu Y, 2024, Research on Quality Control in EPC Project Management for Construction Engineering. Architectural Engineering Technology and Design, 12(4): 100–102.
Qi X, 2025, Risk Management Analysis under the EPC Project Management Model. China Real Estate, 2025(36): 174–177.
Liu F, Li Y, 2025, Research on Difficulties and Countermeasures in EPC Project Management for Municipal Engineering. Urban Construction, 2025(7): 253–255.
Feng W, 2024, Problems and Countermeasures in the Application of the EPC Project Management Model. New Materials·New Decoration, 6(18): 175–178.
Qi S, Qi J, Hua Z, et al., 2024, Case Analysis of EPC General Contracting Management for Construction Engineering: Taking the Pan-Home Ecological Experience Pavilion Project as an Example. Enterprise Reform and Management, 2024(18): 47–48.
Yang T, 2025, Research on the Collaborative Management Mechanism of Construction Engineering Projects under the EPC General Contracting Model. Architecture, 2025(7): 88–90.
Wen J, Zhuang Z, Zhang C, 2025, Research on Sustainable Development Strategies and Green Construction Management for EPC Projects. Architecture and Decoration, 2025(16): 55–57.